Papalanto Power Plant in Nigeria Project After several years running, all the 8 sets of GT units suffered from some faults that influenced the normal operation of power generation. Therefore, Nanguang carryed out a comprehensive inspection and trouble-shooting of all these GT units,in Papalanto Power Plant in Nigeria.
Jinhua Gas Turbine Power Plant Project The overhauling for #5 9E GT located in Jinhua Gas Turbine Power Plant.
Shenzhen Nanshan Power Plant Project Urgent repair of the broken stator vanes and guide vanes for 9E GT of Shenzhen Nanshan Power Plant.
Shenzhen Baochang Power Plant Project Nanguang has urgently repaired the 3rd stage buckets of 2¡Á9E GT units for Shenzhen Baochang Power Plant.
Shenzhen Fuhuade Power Project Overhauling of 9E GT #8 Unit for Shenzhen Fuhuade Power Plant.
Chongqing Iron and Steel Plant Project During intermediate overhaul, Nanguang won No. 1 Prize and a piece of silk banner in the collective labor competition organized by the owner.
Shenzhen Nant ian Power Plant Project Nanguang is undertaking the overhaul for #5 GT13E2 ST Unit and #6 Unit DK1-1N31 ST Unit made by ABB of Shenzhen Nantian Power Plant.
High-tech equipments for 9E GT overhaul During the overhauling process for 9E GT unit, Nanguang used high-tech equipments, and operated laser alignment and adjustment for bearing housing as well as case at the site, so the problems of bearing bush sinking, air escaping, rotor friction and heavy vibration have been resolved effectively. |
||