Customer name |
Description |
9E gas turbine projects in Shenzhen Moon Bay power plant relocation to Garner |
Nanguang has undertaken the Shenzhen Yueliangwan power plant 9E gas turbine overall relocation projects to Garner. The contents of the project include the procurement of spare parts, renovation, overhaul, renovation, painting, packing and the installation and commissioning of the Garner site, performance testing and other content. |
Angola Luanda Power Plant |
Nanguang has undertaken the Angola Luanda power plant 2 * 36MW+1 x gas 37MW steam combined cycle unit control system Mark V mark vie upgrades, including the removal of the Mark V, mark vie, delivery, installation, debugging, training and content. |
Malaysia Tg.Kidurong Power Plant relocation to Pujut Power Plant |
Nanguang through tender for Malaysia Sarawak energy company (sesco) a 6B gas turbine from Tulu people moved to in the United States involving design, procurement, construction of EPC turnkey project. This project involves the design and construction of the main engine and auxiliary equipment foundation after the removal of 6B burner, and in order to meet the requirements of the new power plant, the system is redesigned, and the V Mark control system is upgraded. |
Sunon Asogli??Power Co., Ltd. |
Nanguang has undertaken the project of 4x6B GT sets which was in Yueliangwan Power Plant and Zhuhai Hongwan Power Plant, overhauling, transfomation, transferring for Sunon Asogli Power Co., Ltd. in Ghana, installing,debugging and griding on site, which contains spare parts purchase, overhaul & renewal, dismantling & packaging, oil to gas fuel modification,installation & commissioning, control system upgrade, etc. |
Shikalbaha Gas Turbine Power Plant in Bangladesh |
Nanguang has undertaken Siemens V94.2 installation for Shikalbaha Gas Turbine Power Plant in Bangladesh. |
Papalanto Power Plant in Nigeria |
Nanguang has undertaken 8 sets of PG6581B type GT provided by NTC comprehensive inspection and trouble-shooting technical services. |
LOT2 SUMUT Gas Turbine Power Plant in Indonesia |
Nanguang has undertaken the project of installation and performance test for PG6581B GT generator set and auxiliary equipments in Indonesia. |
Kuching Power Plant in Malaysia |
Nanguang has undertaken 2 sets of PG6541B GT replace the cylinder project because the compressor cylinder and compressor row clinder cracks. |
Garri Combined?Cycle Power?Station Plant ?in Sudan |
Nanguang has undertaken the modification project of 5 sets of PG6581B GT for the plant. |
PT.Sakti Mas Mulia?Company in Indonesia |
Nanguang has undertaken the installation and commissioning of 4 sets of N18-8.83 steam turbine and QFW-18-??2C generator sets for two power plants. |
Shenzhen Nanshan Power Plant |
My Co. has provided them total electrical sets for
5#&6# MS6001 GT;a total set of combined-circle,installation
guide and supervision of three-D transformation for 8 # ST(30 MW);
have carried out a number of gas turbine overhaul and technological
transformation, including the main auxiliary inspection and
repairment, exhaust chamber replacement, and heavy oil
transformation; has undertaken the overhaul for gas turbine and
steam turbine of 9E combined-cycle |
Shenzhen Nantian(former Meishi) Power Plant |
My Co. has undertaken installation for GEN of 9E Gas
turbine-- which made in NGC; has undertaken the overhaul for
5#13E2GT(SwitzerlandABB GT) |
Shenzhen Baochang Power Plant |
My Co. has undertaken the inspection for 9E
GT(125000kw) |
Shenzhen Jingang Power Plant |
My Co. has undertaken the installation,commisioning,
train,maintenance&operating , as well as replancement of exhaut
chamber for MS6001 GT;has undertaken the accident dealment, overhaul
and three-D transformation for 4# steem turbine. |
Shenzhen Futian GT Power Plant |
My Co. has provided them the total sets of 2¡Ác6-35/5
combined circle ST sets, and the installation, commisioning and
technical guide for two sets. |
Shenzhen Mawan Power Plant |
My Co. has provided them the total 220 KV partial
delivery substations equipment. |
Shenzhen Yueliangwan Power Plant |
My Co. has undertaken the overhaul for 2 units GT sets
and exhaut chamber changement |
Zhuhai Shenzhen Energy Hongwan Power
Plant |
My Co. has undertaken the oil to gas transformation
and inspection for their 1#6B GT set |
Humen GT Power Plant |
My Co. has undertaken the installation work for
2¡ÁPG6581B GT set. |
Suzhou Gaoda Power Plant |
My Co. has undertaken the business of oil to gas
transformation for 2¡ÁPG6551B GT sets. |
Suzhou Lantian Power Plant |
My Co. has undertaken the project of installation and
inspection for 2¡Á9E GT sets. |
Changqing Gas Turbine Power Plant |
My Co. has undertaken the whole project of
overhaul,performance adjustment, oil to natural gas transformation
for fuel systems and control systems(Mark1),installation, perfamance
experiment, maintenance and operation for one year for 2¡ÁPG5301N GT
sets, which produced by Japanese Hitachi Co.during the 1970s and
imported by Beijing first Power Plant. |
Sichuan Yinghui GT Power Plant |
My Co. has undertaken the project of
dismantling,packaging, shipping,installation,inspection, oil to
natural gas transformation, performance
adjustment,running,training,etc. for 3¡ÁPG5361 GT sets which
purchased from Xiamen Power Plant. |
Liuzhou Zhenxing Power Plant |
My Co. has undertaken the repair work for their GT and
control room which had been heavily damaged by flood water; has
undertaken the project of turbine control panel hot adjustment, the
hot section inspection, exhaust chamber changement, as will as
upgrades from MKII to MK¢õand training. |
Taizhou Jiaojiang Power Plant |
My Co. has undertaken the work of installation and
performance adjustment for their PG6581B GT. |
Ningbo Shunlong Fengshan Power Plant |
My Co. has undertaken the heavy oil treatment and
transformation for their PG6541 GT. |
Ningbo Kefeng Power Plant |
My Co. has undertaken the transformation from oil to
natural gas, inspetion, as well as repairment for their PG6531B GT. |
Jinhua Power Plant |
My Co. has undertaken the generator system's
performance experiment for their gas-steam combined circle . Their
set consists of GT from Alstom Power(France), heat recovery boiler
from Hangzhou Boiler Co.(China), and steam turbine from NGC. |
Zhejiang Deneng Natural Gas Power Plant |
My Co. has undertaken the pipeline's natural gas
generating project. |
Zhejiang Lantian Gas Power Plant |
My Co. has undertaken the installation and performance
debugging work for their 2¡ÁPG6581B combined circle GT sets. |
Changzhou Suyuan Power Plant |
My Co. has undertaken the transformation from oil to
natural gas for their 3600kw set. |
Jinxi Gas Chemical Co. |
My Co. has undertaken their "Mark VI turbine control
panel transformation" project. |
Chongqing Steal Co. |
My Co. has undertaken the installation, maintenance
and operationg for their 47000kw low-calorific gas GT. |
Huaneng Chongqing GT Co. |
My Co. has undertaken their GT's overhaul and exhaust
room changement for for many times. |
Huaneng Shantou GT Power Plant |
My Co. has undertaken the exhaust room changement |
Liaohe Oil field Oil Gas Concentrating
Output Co. |
My Co. has undertaken the overhaul project for their
GT. |
Shantou Special Economic Zone GT Power Plant |
My Co. has undertaken the overhaul project for their
GT. |
Shengli Oilfield Gubei GT Power Plant |
My Co. has undertaken the project of combution system
transformation from gas to crude oil and natrual gas for their 2
units GT sets. |
Chinese Ministry of Nuclear Industry
Jianfeng Chemistry General Co. |
My Co. has undertaken the training work for their
MK-VI Turbine control pannel. |
Guangdong Dongtang Group |
My Co. has undertaken projects of installation and
performance adjustment for their C25-35/5 steem turbine; and
overhaul and extraction transformation for their N25-35 steem
turbine. |
Guangdong Dongguan Jiulong Paper Co. |
My Co. has undertaken the transformation for their
C25-35/10 steem turbine ;installation and performance adjustment for
their C50-90/7 steem turbine. |
Guangdong Dongguan Liwen Paper |
My Co. has undertaken the overhaul for their C6-35/5,
C15-35/5 and C30-90/5 steem turbine. After the overhaul for their
C6-35/5 steem turbine which produced by Qingdao Steem Turbine Co.,
the long term problem that vibration exceeded standard had been
solved. |
Guangdong Jiangmen North Street Power Plant |
My Co. has undertaken the extraction transformation
for their N25-35 steem turbine. |
Guangdong Nanhai Power Plant |
My Co. has provided them total 6¡ÁN25-35 steem turbine
sets, undertaken the installation and performance adjustment both
for steem turbine and electric equipments. |
Nanhai Rubbish Power Plant |
My Co. has understaken their power plant's project. |
Guangdong Shaoguan Steel Power Plant |
My Co. has undertaken the overhaul for their
2¡ÁC25-50/10 steem turbine sets |
Guangdong Yangshan Power Plant |
My Co. has undertaken the overhaul, installation and
performance adjustment for their 2¡ÁN25-35 steem turbine sets. |
Guangzhou Wanlida Paper Co. |
My Co. has undertaken the installation and performance
adjustment for their C25-35/5 steem turbine. |
Guangzhou Zhujiang Beer Co. |
My co. has undertaken the transformation for their
2¡ÁC12-50/5 steem turbine sets. |
Guangdong Jiangnan Power Plant |
My co. has undertaken the installation and performance
adjustment for their 2¡ÁN25-35 steem turbine sets and extraction
transformation for their 4¡ÁN25-35 steem turbine sets. |
Guangdong Xinhui Shuangshui Power
Plant |
My Co.has understaken the installation and performance
adjustment for their 4¡ÁN25-35 steem turbine setss and total three-D
transformation for their 2¡ÁN25-35 steem turbine sets. |
Guangzhou Mingzhu CT Power Plant |
My Co. has undertaken the overhaul for 2¡ÁN35-67 steem
turbine sets,extraction transformation and electro-hydraulic
adjustment&transformation for their2¡ÁN25-35 steem turbine sets. |
Iron Mining Bureau of Liaoning Power Plant |
My Co. has undertaken the overhaul for their
2¡ÁC25-90/5 steem turbine sets. |
The Power Plant of Liaoning Fushun Petrol
Plant |
My Co. has undertaken the transformation for their
B6-35/5 steem turbine. s |
Jiangsu Pei Town Enveronment Protection
Power Plant |
My Co. has undertaken the transformation for their
C12-50/5 steem turbine. |
Hunan Yueyang Paper Co. |
My Co. has undertaken the installation and performance
adjustment for their C25-35/5 steem turbine. |
Zhejiang Yongke Power Plant
|
My Co. has undertaken the overhaul for their
2¡ÁC12-35/5 and 1¡ÁB12-35/5 steem turbine sets |